Ripley’s Marine Science Building

Broadway at the Beach, Myrtle Beach, SC 29577

The Marine Science Building and Warehouse project was a full design and construction in accordance with the attached exhibit. The project included demolition of the existing structure to be removed above the concrete slab, existing tanks and slab to remain, along with all the equipment and animals to be removed by the Owner.  Epoxy flooring was used across 13,185 square foot of floor. 

Architect: Tungsten, LLC

Owner: Ripley’s Aquarium (Myrtle Beach), Inc.